MIL-K-48196(MU)
5.1.3 Marking . Marking shall be in accordance with
MIL-STD-1169(MU).
5.2 Repair parts.
5.2.1 .Preservation and packaging. Preservation and packaging shall be level A or C as specified (see 6.1).
5.2;1.1 Level A. The key shall be packaged
in accordancd with dwg 8883536 and 8808362 using the
specified moisture barrier.
5.2.1.2 Level C. The key shall be packaged
in accordance with dwg 8808362 except that the moisture barrier may be omitted.
5.2.2 Packing.
5.2.2.1 Level A and C. The key shall be packed in
accordance with dwg 8883536 and 8808362.
5.2.3 Marking. Marking shall be as specified in ac-
cordance with dwg 8883536 and 8808362 as applicable.
6. NOTES
6.1 Ordering data. Procurement documents should specify the following:
6.1.1 Procurement requirements.
a. Title, number, and date of this specification. b. Production or Repair Parts.
c. Selection of applicable level of packaging and packing required (see 5.1 and 5.2).
6.1.2 Contract data requirements (see 4.3.4.1). Data spe- cified in 4.3.4.1 will be delivered as identified on DI-E-1118
or specification when specified on a DD Form 1423 incorporated
in the contract.
6.2 Objective evidence. Records of contractor quality
control and inspections which car be verified.
6.3 Acceptance inspection (equipment (see 4.3.4.1). The contractor shall obtain approval from the Commanding Officer, Picatinny Arsenal, Dover, New Jersey 07801, ATTN: SMUPA-QA-N-I.
Custodian: Army - MU
Preparing activity: Army - MU
Project No. 1135-A128
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business